Feedback on progress of the Black Sheila the other link: Forums / Speedsters / Technical General / Black Sheila Update.
All the cutting and welding of the floor pan is now complete the floor pan is also painted and rubberized.
Assembly started two weeks ago and I am very content with the assembly.
Gearbox is completely serviced, cleaned and painted.
Front sway bar installed very similar to the Porsche 356 design.
CB Performance Rear camber installed.
Shocks painted red and KONI decals fitted.
Under dash e-brake mechanism working great, very happy with the outcome.
Combination Valve installed with residual valves.
All new brake line with steel braided hoses.
All new parts, rubber's, bushes and cables.
Had a major setback with the engine somewhere in the process water seeped through the carbs into the casing and corroded the piston sleeves, a minor engine rebuild is in progress, why a minor rebuild in June 2015 I will be upgrading to a more all new powerful engine.
The next step is to have the engine installed and wiring harness.