The back rib/support section is in progress, and the tins and shroud are mocked. Sandblasting and powdercoat are only three days away now.
The third picture is the napkin-grease-pencil-hurried-sketch operating plan we came up with just before we started in with the recip saw on the three-quarter box tubing at ten this morning.
The rest of the photos from today are in the paininthebug folder.
Three weeks to the big PA show, and six weeks' work left to do. I have no fingernails left, I'm out of cigars and the fridge is empty of Cokes. Time for a delicious and refreshing barley-pop, I think.
Luckily, The Girl is in Miami for a few days, so I can burn some midnight oil with the "wheeled mistress."

Original Post

Replies sorted oldest to newest

The back rib/support section is in progress, and the tins and shroud are mocked. Sandblasting and powdercoat are only three days away now.
The third picture is the napkin-grease-pencil-hurried-sketch operating plan we came up with just before we started in with the recip saw on the three-quarter box tubing at ten this morning.
The rest of the photos from today are in the paininthebug folder.
Three weeks to the big PA show, and six weeks' work left to do. I have no fingernails left, I'm out of cigars and the fridge is empty of Cokes. Time for a delicious and refreshing barley-pop, I think.
Luckily, The Girl is in Miami for a few days, so I can burn some midnight oil with the "wheeled mistress."

Attachments

Images (3)
  • DTM with tins in place 042606
  • framework of hatch 042606
  • supersecret plan 042606
Post Content
×
×
×
×
Link copied to your clipboard.
×
×