Skip to main content

Project 50 is here. Jake's IM was finished last week and left here yesterday.  Project  Speedster arrived here on the same truck. It's one of the nicest clean projects I've bought with a lot of new parts in cartons. No holes have been drilled in the FiberFab body, it's setting loose on an IRS Ball boint  '72 shortened chassis w/ all new brakes, suspension.  Seller stated is a low mile rebuilt engine w/ a 3:88 R & P transmission. I'll fire it up tomorrow to check the mechanicals.  I'll set the speedster aside for a month starting on the Smyth Performance New Beetle pick up truck this Saturday .  Speedster project begins the 1st week of January and done in time for  Carlisle. 

 

20191204_12525820191204_125310

Attachments

Images (2)
  • 20191204_125258
  • 20191204_125310
Last edited by Alan Merklin
Post Content
×
×
×
×
Link copied to your clipboard.
×
×